Kenya 90 MW Thermal Power
The Rabai power plant is a 90 MW combined-cycle thermal power plant located in Mombasa, Kenya. Anergi is a significant shareholder in Rabai Power, alongside Burmeister & Wain Scandinavian Contractor (BWSC), FMO (the Netherlands’ development bank) and the Investment Fund for Developing Countries (IFU). This project was co-developed by BWSC and Aldwych International Limited, Anergi’s project development subsidiary. Rabai is one of the most efficient thermal power plants in Kenya. Anergi (through Aldwych International Limited) played the leading role in this project achieving financial close in September 2008.